Innovations and Limitations of Two Long-Standing Soft Ground TBM
The following article gives an overview over the differences between EPB and Slurry TBMs and shows innovations and limitations of these two philosphies of boring tunnels. EPB and Slurry TBMs, first developed in the 1960s and refined in the decades following, were designed around very different philosophies. Though both prototypes originated in ...
Latest Developments in Shield TBM Selections & Design …
As the principle of an EPB is to develop pressure by creating friction in the screw conveyor and to operate with a full excavation chamber, EPBs are prone to develop high wear rates in abrasive geology. The general layout of an EPB machine is illustrated in following sketch Fig. 1. Fig. 1 Schematic sketch of EPB TBM
Safe excavation of large section tunnels with Earth …
The Herrenknecht S-574 EPB-TBM is not completely explosion-proof, but it was specifically designed to safely excavate gassy rock masses thanks to the implementation of technological solutions and safety procedures that completely avoid exploding mixtures and ignition sources (Dantini et al., 2000) to coexist simultaneously …
Slurry, Hybrid and Large TBMs
General Principles - Slurry / EPB. Slurry TBMs & Slurry Circuit. Multi Mode (Hybrid) TBMs. Large Diameter TBMs. 7. Mixshield System – General Layout. The Two Models for Transmitting the Confinement Pressure to the Tunnel Face (Slurry Shields). Membrane model. Penetration model.
Small Robbins Double Shield Makes a Monumental Achievement
In August 2019, a small diameter Double Shield TBM made a big impact. The 2.46 m (8.07 ft) diameter Robbins machine completed 3,475 m (11,400 ft) of boring with no intermediate access, making it the longest rock tunnel ever bored by a Double Shield TBM under 2.5 m (8.2 ft) in diameter.. The machine completed the Parmer Lane Wastewater …
Surface Settlement during Tunneling: Field Observation …
We address the effect of three groups of factors on supplementary ground surface displacements during tunnel construction. The first group of factors includes the engineering and geological properties of the massif in which the tunneling is conducted; the second group includes the structural features of the designed tunnels and surrounding …
Main Beam
A Robbins Main Beam TBM is complex in its design, yet relatively simple in concept. The front of the TBM is a rotating cutterhead that matches the diameter of the tunnel. The cutterhead holds disc cutters (ranging from 14″ to 20″ in diameter) which are positioned for optimal boring of the given rock type. As the cutterhead turns, hydraulic ...
The Light at the End of the Tunnel: The Positive Side of
The industry is all too familiar with Seattle's SR99 Tunnel and its TBM, known as "Big Bertha". More specifically, much has been written with regards to the TBM needing repairs after about 300 m of boring. The TBM is the world's current largest at 17.5 m in diameter, and is excavating a 2.7 km long drive. Bertha's parts parked on ...
A Tunnel Boring Machine Makes Mining History in Australia
Cutterhead: The rotating circular structure on the front of a tunnel boring machine in which the cutting tools are installed and the spoils are picked up from the tunnel invert.. Disc cutter: A disc-shaped cutting tool that cuts hard rock or mixed ground when mounted to a TBM. Dual Mode "Crossover" TBM: A TBM that combines characteristics from hard rock and …
60 Years of Tunnelling
Robbins is continuing its tradition of innovation with a range of new developments, from EPB-specific disc cutters for mixed ground, to specialized ground support, to a new method of TBM assembly. The Onsite First Time Assembly (OFTA) method was first developed at the Niagara Tunnel Project in 2006 (Fig. 6), where it enabled the swift assembly ...
Breakthrough Robbins "Crossover" Machine Breaks Through
A ground-breaking TBM brought a mining operation one step closer to first coal on February 9, 2015. The Robbins Dual Mode "Crossover" Rock/EPB TBM completed tunneling at Anglo American's Grosvenor Project in Queensland, Australia. The "Crossover" designation is new for Robbins Dual Mode TBMs, and will be used for all such projects ...
Crossover XSE
Tunnel Boring Machines The Crossover XSE TBM—Get the Most Versatile Mixed Ground Machine In urban environments with mixed ground conditions, settlement is not an option, and must be kept as close to zero as possible. The XSE TBM—standing for a Crossover (X) between Slurry (S) and EPB (E), fits the bill in many cases. In […]
Avoiding Sinkholes during Mechanized Closed-Face …
lar tunnel boring machines (TBM). Two common types of TBMs are slurry TBMs and earth pressure balance (EPB) TBMs. While the tunnel shield and completed segmental tunnel linings (usually discrete precast concrete panels assembled together or precast rings) are relatively safe, the TBM excavation process can be potentially dangerous.
What's in a Name? Mixshield, Crossover, Hybrid and More
Mixshield. Mixshield is a terminology introduced by German manufacturer Herrenknecht for what is essentially a Slurry TBM that uses an air bubble to control and support pressure at the face. The air bubble acts like an accumulator with the belief that this offers better pressure control. This type of machine operates only in "closed mode".
Mexico City Metro Line 12
In 2007, the Mexican Federal District announced plans to build Line 12 of the Mexico City Metro. The ICA consortium signed a contract for a 10.2 m (33.5 ft) diameter Robbins EPBM, its back up system, and cutting tools. The TBM was the largest to ever bore in Mexico and was the first EPB TBM to be assembled at the jobsite using Onsite First …
Evaluation of the Adaptability of an EPB TBM to Tunnelling
The equation commonly used to predict the total thrust of an EPB TBM is where Fs is an empirical coefficient with a value within 700–1,200 kN/m 2 and De is the excavation diameter [ 37 ]. Based on the known value of De = 6.980 m, the adaptability range of the total thrust was determined to be 26,785–45,918 kN.
Press Releases
Robbins EPB caps 62 km of Tunneling with Final Breakthrough at Emisor Oriente. On May 23, 2019, the last of six 8.93 m (29.3 ft) diameter EPBs completed excavation at Lot 4 of Mexico City's Túnel Emisor Oriente (TEO), a feat marking the completion of ten years and 62.1 km (38.6 mi) of tunneling. ... 2017, a 6.65 m (21.8 ft) …
Applied Sciences | Free Full-Text | Hybrid Random Forest …
Construction-induced ground settlement is a serious hazard in underground tunnel construction. Accurate ground settlement prediction has great significance in ensuring the surface building's stability and human safety. To that end, 148 sets of data were collected from the Singapore Circle Line rail traffic project containing seven defining …
Robbins
At the Mill Creek Drainage Relief Tunnel in Dallas, Texas, USA, a Robbins Main Beam TBM underwent an in-tunnel diameter change for the first time in the industry. The machine went from 11.6 m diameter to 9.9 m diameter through teamwork, perseverance, and top-notch engineering. Watch the video to find out more about the ground-breaking process ...
The Next Revolution in EPB Cutters – New Cutter Designs …
The cutters operate properly as the pressure increases in an EPB tunnel, but if the pressure decreases the cutter housings can easily become jammed with fines and disable the pressure compensating mechanism. Robbins engineers hope, with a novel design, to specifically eliminate problems that can occur when using pressure compensated cutters …
Madhan P N
Project Manager at Robbins, with around 15 plus years of experience in engineering geology and other geotechnical engineering related services to clients in Metro Tunnels and Dams. Had experience of 3 years in hydro power projects PFR and DPR studies...and presently another 11 years of experience especially in mechanized tunnels driven by all …
Incredible India: Machines on the Move in Agra and Delhi
With the first TBM well into tunneling, a second 6.65 m Robbins EPB underwent site acceptance on April 13, 2023 to bore a parallel 1.3 km long tunnel in soft soils. ... The crew gathered for a ceremony before sending the TBM on its way. The crew gathers for the site acceptance ceremony of the second Agra metro EPB. To First Breakthrough!
One-Dimensional Convolutional Neural Network for Pipe Jacking EPB TBM
An earth pressure balance (EPB) TBM is used in soft ground conditions, and these conditions lead to the fluctuation and instability of machine parameters. Machine parameters influence cutter wear and tunnel excavation. For this reason, to evaluate and predict the cutter wear of an EPB TBM, a 1D CNN model was used to provide machine …
Tunnel Boring Machine
8.2.1 Tunnel Boring Machines for Hard Rocks. The principle of the TBM is to push cutters against the tunnel face and then rotate the cutters for breaking the rocks in chips. The performance of a TBM depends on its capacity to create the largest size of chips of rocks with the least thrust.